THUNDER VALLEY CASINO
Lincoln, CA


Thunder Valley Resort & Casino was designed and built in phases. Phase I consisted of a 240,000 square feet of casino floor, and onsite-expandable waste water treatment facility, a 6,000 square foot fire station, and an 8,000 square foot central plant. The Phase II expansion consisted of a 462,000 square foot, 22-story hotel tower that includes the 221,700 square foot expansion of the main casino level, a 219,000 square foot expansion of the second floor, a 50,000 square foot performing arts showroom, and a nine-level parking structure.

Harris Consulting Engineers provided complete Mechanical, Plumbing and Electrical design services.